Innovations

Hospital “Grab and Go”

Published on 16 April 2019
Pinched with Pride twice

Traditionally the route to the nearest A&E is printed and displayed on site notice boards. In the event of needing to get an IP to A&E time could be wasted writing down the route or postcode,... Read more...

Bailey Bridge Improvements

Published on 16 April 2019

Following recent incidents and near misses with temporary bridges, Murphy have challenged the decades old methodology of erecting bailey bridges. Traditionally bailey bridges have been erected bay by... Read more...

Women’s Convenience Packs

Published on 12 April 2019
Pinched with Pride 3 times

Being a women working within the construction industry on site is invigorating, interesting and fairly new to a predominantly male orientated institution. As the female population grows within... Read more...

Smart technologies. Clean solutions.

Published on 12 April 2019
Pinched with Pride once

A critical challenge in delivering surveillance on the SRN is that areas which need surveillance do not always coincide with the availability of power and a network connection, to both record relay... Read more...

Self-Boarding Gates (SBG)

Published on 8 April 2019

Leading the way in developing biometric capability across the passenger journey, and working in conjunction with IATA to help shape compliance and guidance for Automating the Journey. Installing... Read more...

Self-Service Bag Drop

Published on 8 April 2019

Leading the way in developing biometric capability across the end to end passenger journey, and working in conjunction with IATA to help shape compliance and guidance for Automating the Passenger... Read more...

Chambers Wharf Retained Earth Slope

Published on 4 April 2019

The installation of a retaining wall to separate two working platforms was required at the Chambers Wharf site. The initial design involved the interlocking of Legato Blocks where the materials and... Read more...

Use of GGBS in Cutter Soil Mixing works

Published on 4 April 2019

Due to the in-ground contamination constraints at Tideways Earl Pumping Station Site a Geomix wall was required to be in place prior to Diaphragm Wall activities commencing. The effect of this was... Read more...