Innovations

INV00348 Tablet Friendly PPE

Published on 24 March 2016

C412 Bond Street have adopted the utilisation of mobile tablet devices on site utilising the field supervisor application. This is controlled by a Mobile Technology Policy and the Use of Tablets Task Briefing. Read more...

INV00336 Slurry Wall Panel

Published on 23 March 2016

During the OCI phase, HMJV identified a Value Engineering opportunity, installing slurry wall panels inlieu of jet grout blocks behind each portal headwall. Read more...

INV00333 PPE for Drivers

Published on 23 March 2016

The PPE for drivers initiative was introducd to ensure that all vehicles are fully compliant with Crossrail’sguidelines and to ensure that there are no risks associated with BFK vehicles, and to help preventaccidents. Read more...

INV00332 3D Model

Published on 23 March 2016

The construction sequence of the Square Shaft at Western Ticket Hall, Farringdon is extremely complicatedto understand without 3D visualisation. Read more...