Innovations

INV00287 Single Operative Surveying

Published on 23 March 2016

During the installation of the Diaphragm Wall at C405Paddington CSJV had to ensure over and above standard quality checks that were expected of them to ensure that we delivered ‘Right First Time’. Read more...

INV00286 Zoning Environmental Receptors

Published on 23 March 2016

Due to the heavy civils works and the volume of delivery required from C405 – The CJV Environmental Team devised a plan to balance construction impacts on the different receptors on the commercial and residential buildings. Read more...

INV00284 Water Footprint Smart Meter

Published on 23 March 2016

During Diaphragm Walling activities, the c405initiative was to install smart meters at thebentonite plant.This was to review waterconsumption for this activity as currently it isunknown. Read more...

INV00938-C610-Concrete washout waste disposal chamber

Published on 23 March 2016

C610-Systemwide is delivered by ATC joint venture who are responsible for the fit out of 21km of twin bored tunnels. The scale of C610 and the variety of plant, materials, fuels and chemicals demonstrate some significant challenges and opportunities in delivering a ‘world class’ railway whilst protecting the environment from harmful pollutantsand substances. Read more...