Innovations

INV00248 Clay Farming

Published on 22 March 2016

Team BFK at Northfl eet store thousands of tonnes of spoil from the TBMs which then get transferredto Wallasea by ship. Read more...

INV00955-C350-PML-Mobile survey data

Published on 22 March 2016

At C350 Pudding Mill Lane as on most sites there is a large amount of data collected from pre-pour and As-built surveys, and from monitoring data collection. It is important to manage the data and to provide information as quickly as possible after survey completion. Read more...

INV00247 Door Jamb Safe Access Harness

Published on 21 March 2016

The C405 Paddington Project is required to carry outmonitoring of historic buildings for asset protection and thismonitoring is performed at Paddington using 35 AutomatedTotal Stations (ATS) located around the construction site andcontrolled remotely 24/7. Read more...

INV00956-C502-Synchro SITE and Synchro Pro

Published on 21 March 2016

C502 is pioneering the use of new Synchro products for construction planning and progress tracking. Synchro Pro allows users to associate the 3D BIM model with the construction installation schedule (programme) to improve communication and clarity. Read more...

INV00245 Solar Powered Automated Total Station (ATS)

Published on 21 March 2016

Adjacent to the existing Paddington station in London,CSJV are constructing a brand new world class stationfor Crossrail. The existing mainline rail station is madeup of several grade I and II English Heritage listedbuildings. Read more...