Innovations

INV00237 Water Saving Measures

Published on 21 March 2016

Thames Water announced water restrictions starting from April 2012 during a period when ConnaughtTunnel (C315) required extensive water usage for activities including grouting, tunnel cleaning anddamping down a site of over 10,000m2. Read more...

INV00235 3D Laser Scanning of Spray Concrete Lining (SCL)

Published on 21 March 2016

After the primary profile of spray concrete lining is applied there is a requirement to identify any out of tolerance areas of SCL so that these can be remediated in order that reinforcing steel can be placed onto a surface that is within the tolerances required. Read more...

INV00223 Panoramic Site Layout

Published on 21 March 2016

The site at Northfl eet inert waste transfer facility is of considerable size (actual fi ll area of over 50,000m2and the capacity to stockpile over 380,000m3 of excavated material). Read more...

INV00219 Community Hoarding

Published on 21 March 2016

Crossrail and HMJV have taken the initiative to improve community relations by involvingvarious age groups within the local community in a collaborative art programme. Read more...