Innovations

INV00216 Wind Alert System

Published on 21 March 2016

The wind alert system that is used on C405 indicates the wind speed subject to material being lifted not just the operational speed of the crane. Read more...

INV00208 Hybrid Powered Mobile Elevated Work Platform

Published on 21 March 2016

We have recently taken delivery of Hybrid MEWPS from Niftylift which use substantiallyless diesel fuel than traditional working platforms and as a result emit fewer CO2 andNOx pollutants. HMJV recommend use of the Height Rider 21 MEWP for Crossrail. Read more...

INV00209 Segment Tracking System

Published on 21 March 2016

In order to ensure that each tunnel ring segment is of the required standard, HMJV haveimplemented an easy to use segment tracking system to automate the delivery process. Read more...

INV00203 Stairmaster

Published on 21 March 2016

A lightweight former is used as permanent formwork for stairs which includes the steel reinforcement when it arrives on site. Read more...

INV00202 Tower Crane Rescue

Published on 21 March 2016

Operatives driving the tower crane or maintenance operatives working on the jib of the tower crane are at risk of being in an exposed location in the event of an emergency. Read more...

INV00201 Unistrut Drainage Supports

Published on 21 March 2016

Raft Slab for new Crossrail Station at Bond Street Western Ticket Hall is 1.5m thick and design required 100mm and 150mm drainage pipework to be installed in the core of the slab. Read more...