INV00247 Door Jamb Safe Access Harness

Published on 21 March 2016

The C405 Paddington Project is required to carry outmonitoring of historic buildings for asset protection and thismonitoring is performed at Paddington using 35 AutomatedTotal Stations (ATS) located around the construction site andcontrolled remotely 24/7. Read more...

INV00956-C502-Synchro SITE and Synchro Pro

Published on 21 March 2016

C502 is pioneering the use of new Synchro products for construction planning and progress tracking. Synchro Pro allows users to associate the 3D BIM model with the construction installation schedule (programme) to improve communication and clarity. Read more...

INV00245 Solar Powered Automated Total Station (ATS)

Published on 21 March 2016

Adjacent to the existing Paddington station in London,CSJV are constructing a brand new world class stationfor Crossrail. The existing mainline rail station is madeup of several grade I and II English Heritage listedbuildings. Read more...

INV00242 Spanish Observation Cards

Published on 21 March 2016

Following World Health and Safety week in 2012, the team at BFK underwent a push on engagement witheveryone on the team to ensure complete understanding of the requirement to work safely. Read more...

INV00968 – C610 – Pull-test Support Bridge

Published on 21 March 2016

As part of the ITP we are required to test all bolts used within the tunnels. Part of this stipulation is to pull test the bolts once installed within the tunnel. Currently we have no ability to perform this test in situ with the final anchor in place. Read more...